How to operate the belt assembly line power supply
2021-04-21(1300)Views
The power of the belt assembly line is generally driven by electricity. The power supply of the belt assembly line must have certain electrician knowledge to operate. Otherwise, it is easy to cause major hidden dangers. Below, Guangshengde will analyze how to operate the belt assembly line power supply for the big analysis.
Belt assembly line
1. Operating instructions for power electrical appliances in the belt assembly line:
The power supply of the assembly line needs three-phase four-wire, and a master switch is installed outside, (three-phase four-wire four switches can be used, or the switch can only control the three-phase power supply, and the neutral line is direct. Be careful not to connect the neutral line of the second method. Also through another switch). The N of the distribution box is connected to the neutral line, A, B, and C are connected to the three-phase power supply, U, V, W are connected to the motor, 3, 4 are connected to the F1, F2 of the speed control motor. 5, 6, 7 are connected to the speed control motor The u, v, w.
2. The method of starting the motor on the belt assembly line
Turn on the power first. At this time, all three power indicator lights will be on, which proves that the three-phase power supply has arrived at the distribution box. At this time, you can press the blue button on the motor to start the motor. If it fails to start, you can open the door of the distribution box to see if the second DZ108 switch in the lower row is red long and blue short. If it is not for this blue one, it will be fine. After the motor is started, then turn on the switch of the assembly line speed controller, and then slowly adjust the potentiometer of the speed controller upward to make the speed expressed to the desired speed. When shutting down, first slowly adjust the potentiometer of the speedometer to zero, then turn off the switch of the speedometer, and then press the red button of the electric switch to stop the motor. Then turn off the main switch.
Latest News
-
Comparison of structural composition and advantages&disadvantages of automated assembly production lines
The automatic assembly production line is a system that asse...
-
Interpretation of the structural characteristics and accuracy for pick and place machine
Whether it is a fully automatic or a manual , whether it is ...
-
Grandseed LED Intelligent Equipment
Main business: Electronic integrated production line solutio...
-
Key points of wave soldering equipment operation
Wave soldering equipment is currently widely used automatic ...
400-0599-111
Hotline:400-0599-111
phones:138 2871 9992
Fax:0755-27315980
Email:gsd@sz-gsd.com
Address:Grandseed Science and Technology Park, No.177, Fenghuang Avenue, Fenghuang Community, Fuyong Street, Bao'an District, Shenzhen